The building designed in wood structure by the DREAM agency includes 3 programs for the athletes of the 2024 Olympic and Paralympic Games in Paris:
- a food court
- work spaces with loggias from the 1st floor to the 6th floor
- a sports area on the top level, crowned by a wooden framework offering a free height of 10 m.
Equipped with a convivial space with a sports bar, this rooftop offers beautiful views over Paris.
The building offers open and bright workplaces, and the tree-lined loggias will also serve as informal workplaces. The building's façade echoes the industrial past of Saint-Ouen through the generous proportions of its large windows. Its architecture is made up of noble materials: wood in the structure, glazed terracotta cladding and metal sunshades.
CALQ is responsible for the project's site management, contributing its experience in wood structures.
Complementary infos
DEVELOPER SCCV Saint-Ouen Héritage represented by Eiffage Immobilier and Nexity
ASSISTANTS OF THE DEVELOPER Nexity
ASSISTANT HIGH ENVIRONMENTAL QUALITY ARP ASTRANCE
ARCHITECT DREAM
SITE MANAGEMENT CALQ
STUDY OFFICES SETEC Bâtiment | SETEC TPI | QIOS | Fontaine Ingénierie | AIDA Acoustique | Joseph Ingénierie | CL Infra | Elément Terre
LANDSCAPE DESIGNER ATELIER GEORGE
CONSULTANTS Socotec | BEDOC | Euro Coord
GENERAL CONTRACTOR Eiffage Construction Tertiaire
AREA 14 000 sqm.
WORK COSTS €50 M
STATUS Completion in 2023
ENVIRONMENTAL PROFILE HQE 2016 Sustainable Building Excellent | BREEAM New Construction Excellent | E2/C2 with a desire to move towards E3/C2 | BBCA label standard level